Re-routing 56" gas pipeline at km 406 Pataveh (2 Km x 56")
Re-routing 56" gas pipeline at km 406 Pataveh (2 Km x 56")
Completed
1985/04/21
2022/02/05
Manager
N.I.G.C
Geography Location
Pataveh - IRAN
لوگو فوتر

Lorem ipsum dolor sit amet, consectetuer adipiscing elit, sed diam nonummy nibh euismod tincidunt ut laoreet dolore magna aliquam erat volutpat. Ut wisi enim ad minim veniam