Main oil pipeline from Cheshmeh Khosh production unit No.1 to Ahwaz production No.3 (151 Km x 18")
Main oil pipeline from Cheshmeh Khosh production unit No.1 to Ahwaz production No.3 (151 Km x 18")
Completed
1976/03/21
2022/02/05
Manager
O.S. Co
Geography Location
Ahwaz - IRAN
لوگو فوتر

Lorem ipsum dolor sit amet, consectetuer adipiscing elit, sed diam nonummy nibh euismod tincidunt ut laoreet dolore magna aliquam erat volutpat. Ut wisi enim ad minim veniam